Aemulus at the Runway vs Green Solution House.
duration: 8 weeks
percentage: 50%
the brief.
In groups of 8, we were required to choose two case studies on the application of passive sustainable design strategies within an architectural project. One of the projects were to be from a tropical climate region while the other from a different climatic region. Then, we had to identify and compare the passive design strategies applied in both case studies including the site planning, day lighting, façade design, natural ventilation and strategic landscaping. Further analysis and elaboration on the impact of these passive strategies on the quality and spatial experience of the chosen project was also mandatory.
outcome.
Video Report